As of 22R2, a Downtime clocking can be started without providing a Downtime Cause.
At what point in the production clocking/reporting process is it required to have a value in the Downtime Cause field, e.g., a value must be entered before ‘X’ occurs or before ‘X’ can happen. What is ‘X’?
This field cannot remain blank forever, or can it?