Hi,
We are struggling with our setting of a DOP within a project. For some parts, which are set to “pegged”, want that IFS looks at the standard stock first. If we have it, we don’t need to make or buy it.
But we notice that our DOP only looks at the project stock, which is off course empty. So he makes PR’s/SO’s for everything, without looking at the standard stock.
How can we solve this?