Hi,
Can someone give me some insights on the difference between unit cost and part cost?
- If I manufacture a standard part, with labour and material, for the first time, it looks like IFS puts the standard cost into the unit cost after receiving (I did not do any calculation up front). This value is ok, do I need to do the part cost calculation? What’s the consequence If I don’t?
- Configurable parts, with standard cost and cost per config setting, seem to have that cost on the unit cost. If i make a config for the first time, IFS adds the cost in the unit cost. Do I need to do the calculate cost up front in the DOP of interim header?