We have recently upgraded from APPS9 to APPS10 and have noticed that on the production receipt that the option to Backflush and Defer Backflush is no longer available.

Has this capability been removed from APPS10? And if so is there an alternative procedure in APPS 10 to replace this?

Many Thanks,

Dan


2 replies

Userlevel 4
Badge +9

Hi The option in the new form is “Background Job”

 

Userlevel 3
Badge +6

Hi dameenda,

Thank you for your reply - When we tested using the Background option in APPS10 the only difference we can see is - if there is a shortage on a production receipt this will fail in the background without creating a receipt.

I believe the advantage we had of using the Defer Backflush capability is that the operation would create a receipt even with the component shortage - we could then continue to move the stock and address the shortage later in the day. This is so one line is not waiting for the other to be completed.

In this scenario - is there a way of us still achieving this outcome?