Looking to adjust the manufacturing lead times manually in IFS. Inventory part planning parameters doesn’t have the field and the manufacturing tap will not allow manual entry. Has anyone updated the manufacturing lead-times manually for planning purpose?
Page 1 / 1
If you want to manually update the lead time calculated from the routing on the Inventory Part/Manufacturing tab, this should be allowed.
Thank you Bjorn,
Unfortunately this field is blocked for manual update here. Probably a system setting. I’ll have to investigate here. Thank you again.
In IFS Cloud:
You can force a Manufacture lead time in the below tab ‘Lead Times and Supply Dates’ in ‘Inventory part’ BUT when a routing leadtime calc is run it will force overwrite your manually entered figure:
Thank you for the input.