If a valid control plan manufacturing revision exists for the part of interest, then it should be connected to the shop order automatically when the shop order is created, regardless if the shop order is pegged to a customer order or not.
The control plan revision is valid if the status is Active, and the shop order need date falls within the date range defined by the control plan revision Phase In and Phase Out dates.
If a valid control plan manufacturing revision exists for the part of interest, then it should be connected to the shop order automatically when the shop order is created, regardless if the shop order is pegged to a customer order or not.
The control plan revision is valid if the status is Active, and the shop order need date falls within the date range defined by the control plan revision Phase In and Phase Out dates.
Hi Peter,
Thank you for the response. Your explanation resolved my issue as I didn't check the phase in date of control plan and finish date of the shop order. After adjusting the dates, I was able to connect and use it .