Hello,
I’ve set up a calendar where I have a shift pattern like this:
Shift 1: 10pm - 6am
Shift 2: 6am - 2pm
Shift 3: 2pm 10pm
Where I’m using the “Last Period Belongs to Next Day” flag as follows:
Schedule looks like this:
This works fine/as expected for capacity generation.
However, I’ve tried to create a Period Template using this calendar (set as site manufacturing calendar) and I get an error message.
I think this is because ‘Sunday’ does not exist in the calendar, because the working period belongs to Monday. However the period start date is Sunday, so this is what the system is trying to use to start each period.
Is there any way to correct this? Or should I just create a new calendar that runs 12am-12am to use for the period template?