Hi, one of our customers is having the above issue when the following test plan is followed. Is there any rectification from RnD for this?

1. Go to Assembly and Disassembly product structure for an existing top position part (GE/00-00-00)
2. Now the focus is to create a mismatch in the line item numbers in between Assembly Side and Disassembly side for the same part.
3. Add a random inventory part with different line item numbers on each side. (E.g: Part LINEITEM5 with line item 100 in Disassembly side and 200 in Assembly side)
4. Now add a new part (LINEITEM4) as a new structure position in serial structure template and enable auto transfer to manufacturing.
5. Position parts will be added in the product structure with different line items in-between Assembly and Disassembly sides.
6. Include these position parts in maintenance level structure of GE/00-00-00 (Maintenance level: LINEITEM)
7. Now create an MRO flow, set the maintenance level in Disposition Work Scope, Release the MRO interim order structure. (WO: 239075)
8. Go to top Assembly Shop Order material tab. As you can see the material lines are not available.
9. Now check the interim order structure component tab. Lines are not available there as well.

Hi Bhanuka,

This issue is actually rectified by RnD via patch ID 159650. And it is available with UPD13.

Hope this helps.