Hi,
If I drag and drop operation to a occupied resource (workcenter), APB will automatically reschedule the operation that’s allready there.
However, I don’t want that. I want to temporarly overload the workcenter, and afterwards drag and drop the operation that i want to move to another date.
How can I turn the feature off?