All,
I am working with a client that needs a second overhead rate on the labor class that is based per hour. I know I can define additional labor overhead cost elements but they are only allowed to be based by unit produced or as a percentage of labor.
Has anyone figured out a way to get the second labor overhead rate to be per hour? No, I do not want to do a calculation to figure out a rate per piece based on the standard labor hour of the item as that does not account for variations in actual hours during production. Nor is it a percentage of the total labor .
Thanks!!!