Hi, I have been asked to change a wrong valid from date in the Position Structure screen, but can find no way to edit the existing row or add a new row in it. The screen in question is the one below. So if this a read only screen, which screen is the one to use to edit such information? Please let me know the navigation to the screen I need to go to.
I have already checked the Positions screen, and the dates are correct there.
This is the screen showing the wrong Valid From date, which is different from the screen above. Thanks