Hi,
We have some employees on half time working (90%, 80%...etc of the day rather full 1 day) for certain schedules. On the absence part, we need that this half time must be applied for the absence limit. For example for the person with Calendar 90% is the absence limit is not 1day but should be 0.90 day.
So if we import absence limit as 1.80 and If the employee has 1.80 days left it means that it should equal to 2 days in theory in order to allow him to take those on the absence calendar.
However, when he books leaves for 2 days on absence calendar he can't take 2 days because system considers the leave balance is 1.8 days (not 2 days) and system notifies that absence limit is exceeded since system considers that 1 day = 1 (not 0.9).
How can we convert the 1 day to 0.9 to sort this issue?
Please advise?
Thanks in advances
Nimesh