I have some experience with it today and wanted to know about yours.
Based on my limited experience:
- I like the process is very well described.
On the other hand, I find the following aspects quite challenging:
- Joining any disconnected items
- Undoing all applied baseline changes
I mean points 2 and 4 in Base process
Picture from the documentation to make the post more visually appealing