We have always relied on a contractor for our document changes. We are attempting to handle those internally now and we were sent all of the rdf, layout and schema files from our previous contractor. I’m finding that some of the changes we need to make are in the .rdf files and I’m assuming those are only accessible from the IFS Developer Studio, not Report Designer.
Has anyone else successfully transitioned their operational/trade docs from a contractor to in house or contractor to contactor?
We are on APPS10, UPD16