Question

IFS health and Safety platform

  • November 28, 2023
  • 1 reply
  • 84 views

Forum|alt.badge.img+5
  • Do Gooder (Customer)
  • 17 replies

Is it possible to schedule a safety inspection in IFS apps10 and then have it auto-schedule. ie create an inspection for 1st January and have it repeat 1st of each month. Or is it still manual and needs a new inspection to be created for each month?

1 reply

Forum|alt.badge.img+11
  • Hero (Customer)
  • 149 replies
  • November 28, 2023

I dont know what capability IFS has to schedule these, but looking at it from another angle, but could create a basic migration job to create a new inspection, then make it scheduled on the start of each month to create a new one?