Question

Inventory part lot batch cost adjustment (NRV)

  • 7 December 2021
  • 0 replies
  • 50 views

Badge

On the accounting side, I have to reduce the cost of inventory parts for every lot batch. I know I can do this through the  “Inventory part modify level cost” as a Cost adjustment for each lot batch. But some of the inventory has more than 1000  lot beaches  so I must adjust the cost one by one.so If there are other ways of doing it.


This topic has been closed for comments