Scenario 1. One manufacture part with multilevel structure and routing.
When I calculate All level part cost calculation and All part cost calculation . Part cost calculation will be the same or different.
![](https://uploads-eu-west-1.insided.com/ifs-en/attachment/79423c14-4fb4-470a-b199-f45e5fa6b830.png)
Scenario 2 If we have the same part with only one default structure and routing.
When I calculate All level part cost calculation and All part cost calculation. Part cost calculation will be the same or different.
![](https://uploads-eu-west-1.insided.com/ifs-en/attachment/ff138c51-a2e4-4164-b6ed-a3dbc8a61fdb.png)
Can please clear this two Scenario