Is there a way in IFS 9 to update the status of multiple work order postings in mass instead of having to do them one at a time? We have over 800 postings where the status needs to be changed to “Invoiceable.”
Is there a way in IFS 9 to update the status of multiple work order postings in mass instead of having to do them one at a time? We have over 800 postings where the status needs to be changed to “Invoiceable.”
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.