Hi,
Here is my travel cost model configuration. I am trying to achieve a scenario where the DSE will schedule as follows:
On an empty shift, activities can be scheduled within a hour hour radius from start location - therefore offering a wider range for where activities can be scheduled.
Where a pre-existing activity exists on a shift, limit travel to 1 hour from that activity to the one being scheduled.
Should the configuration I have in place achieve the above?
No max shift travel is required.
thanks.