Hi,
Looking for some advice to see what’s possible with this scenario.
I have a resource ‘x’ working 8hrs. The have a van and can travel to jobs within a 60 mins max travel.
I also have a second resource ‘y’ working 8hrs, but they don’t travel as customers bring their vehicles to one of our locations.
I want to be able to set up the resource ‘x’ to say for the first 4hrs of the shift they have a max travel of 0 mins then the second 4hrs to be back to 60 mins.
This will then enable resource ‘x’ to assist in a Service Centre for the morning, and then go mobile in the afternoon with PSO taking him back home.
There’s other scenarios where we may use this also, i.e. the Vans in for repair or service. So I have looked at Vehicle setup in ARP, but that appears to be around capacity and / or travel based on range.
I have thought about lowering the cost/ph and increasing the cost/km during the shift so it encourages Base work, but that would still allow travelling for the first 4 hours when we don’t want them to.
Is anyone doing something similar to the above, or worked on a project where something similar has been implemented.
Regards
Ady