Dear PSO Experts,

We have tested the Barriers functionality and found out that dynamic changes in the blockage direction, for instance changing this parameter from "Both" to "Clear" , only works if a new LOAD is sent to PSO. Is this correct? Let's say we are working on a PSO production environment and on Monday at 11 am it has been decided to remove an existing barrier at 3pm. How do we do that if it is not possible to send a new Load a 3pm? We are on PSO 6.13.0.25

Best regards

Miguel

Just to update this post with the answer provided by IFS R&D: “when a change is made to the travel barrier, it will also modify the travel profile, as the barrier is configured under the travel profile. To detect any changes made to the barrier, a reload or service restart is required”