We are aware how to utilize the “Exclude from Scheduling” checkbox at the Work Task level to prevent the entire work task from being sent to PSO. However we have a need to exclude only specific work assignments from scheduling, while other work assignments on the same work task get sent to PSO. Is this possible?
Be the first to reply!
Reply
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.