hello,
In Dispatch Console - If i schedule and fix a manual activity to resource ‘A’, if an emergency presents itself, we may need to un-schedule the work, and re-assign it to resource ‘B’. In console, it does not appear to break the fix on the activity. The fix sticks in PSO workbench, appears as allocated even though it has been un-scheduled, and should go back to an un-allocated status. If we were to un-schedule the fixed actvity from resource B - even though it is a manual activity, it re-schedules back to the original resource (resource ‘A’) because the fix is still tied to the original resource.,.. is this expected behavour?