Lets say i purchase 10 pcs of an article that are stocked but later 5 pcs of this article was found deviating, is it then possible to scrap these 5 pcs and link scrapped qty to purchase order and supplier so that they can be found in the quality statistic for this supplier, and can be calculated within the PPM figures for each month?
(Tried to use NCR but it dosen’t work to link scrapped qty in stock to supplier so then the statistic becoms wrong, based on other topics it looks that we has to look into the MRB meny to get this function, or?)