Hi Guys, I have migrated a number of product structures - instead f going through and making them buildable 1 by 1, is there a way of doing this on mass ?
I guess you will need to write a small script do this. Hope you will need a similar way to handle Routings too.
Hi
In Apps10 EE you can use the Structure Alternates page to find and select all the Tentative structure alternates and right-click ‘Build’.
In Aurena use the Manufacturing Structure Alternates page to do the same.
Apps9 and previous I cannot recall if the Structure Alternates page was available.
Apps 9 - Structure Alternates is the same and all of the various state’s can be changed en masse from this overview. A script is not required.
The same is true for routings, use routing alternates, a script isn’t necessary.
Yes,correct I overlooked it.
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.