Skip to main content

Hi, does anyone know how to book time to an OP when that OP is on an outside work center but there is a labor factor on the routing (and shop order OP).

There doesn’t weem to be a way so why does IFS even allow the user to create an OP for an outside work center that has a labor factor!

My feeling is that there’s a setting somewhere to enable but I can’t find it.

Many thanks!

And BTW, we are working completely in Apps 10 Aurena, not EE (which does have a checkbox to show outside work center OPs but still doesn’t allow labor time to be booked).