would like to hear from you, your experience in dealing with received parts
- move into stock
- inspection at arrival
- move to QA, inspect at QA
- other exceptions - to arrival only, and need to move to quarantine
are you using different color label to have visual direction? for example,
- move into stock - normal white label.
- inspection at arrival - green label, if passed, QC to print normal white label.
- move to QA, inspect at QA - yellow label, once passed inspection, QC to print normal white label, but if failed, red label.
- other exceptions - to arrival, and need to move to Quarantine - red label.
Are you using the above methodology to drive the material flow? if not, what else you used to perform the same?