I need some help regarding a flow. we have 3 Design objects as below, where PIPE01 and PIPE 02 are connected to a parent design object called "FAB_PIPE-PACKAGE". so those are still in Design object as status Under Design. PIPE01 and PIPE 02 has materials connected as SPOOL 1 and SPOOL2 as additional parts (and I want them to be added in work task as material demands.) Now I need to create a work order and send to b2b portal. can we create a one wo for parent design object and add 2 tasks for child design objects each PIPE01 and PIPE02 and then can we get materials in to each work task as SPOOL1 and SPOOL 2 ?
The expectation is to handle the work tasks through b2b portal after tender is approved..
Design Object status- Under design (can we handle this flow from that status?)
Need work tasks for each PIPE01 and PIPE02.
what is the best solution for the above scenario.