@Elthuad Brongak Something to consider is the use of Lead Time Offset in the Product Structures. Lead Time Offset The number of days before the end date of the order that the component part is required. If this value is 0 (zero), the component is required at the beginning of the order. If the lead time offset is greater than the time between start and end date, start date will be the component required date. The Lead Time Offset will not be considered if the material line is connected to an operation. Instead, the start date of the operation will be considered as the date on which the material is required. The picture below represents the scenario you defined above. Setting the LTO for B in the structure for A to 5 days and the LTO for C in the structure for B to 2 days should get you the result you want. Experiment with this for the scenario above. Thank you Matt. That is the answer i have been looking for.
Thank you for the reply but that is not what i have been looking for. Pressing F1 and reading the document is ok for me but i need some real life examples and reasuls about MS. I can learn it by trial and error method but it takes too much time other than learning from an example.
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.