We do our Product Life Cylde in an other system (PLM in fact) and we manually transfer Product Structure from PLM to IFS, We were not able to connect both system until now, mainly because in PLM, we have the engineering BOM and Manufacturing BOM, but the way we organized our shopfloor (Work Center, ...), in IFS we create kind of Logistic BOM, (Flat BOM for each Work center to issue (backflush) material from the inbound location. Does someone have any experience on connecting PLM with IFS?
Thank you for your answer, is there a possibility to connect this engineering part to an existing Work Center, with a routing?OUr idea is to create Engineering Part during the RFQ phase and R&D phase, and we would like to see the Work Center machine and Labor Load in the S&OP.
Good afternoon,I discovered this Engineering Part between Master Part and Inventory Part. In which way do you use Engineering Part?Part in Developpement phase before to land to the plant and to be created as Inventory Part?thanks for your support.
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.