Hi Mats,The steps we took are below along with what we are seeing post running both selective MRP and also waiting for full MRP to run.Created a revision to the * alternate product structure with a phase in date of 1/3/2022; this created a phase out date/revision to this inventory part and the existing active product structure to be 1/2/2022. The original * alternate has a raw material (ABC123) that we are trying to phase out and the new revision consisted of the same ingredients in the BOM with the exception of substituting the phased out item (ABC123) with a new part (DEF123) Ran selective MRP for the FG item as well as the two raw materials in question. Shop order requisitions were generated based on forecast loaded for the FG. This drove purchase requisitions for ABC123 through 1/2/2022 to align with the phase out date on the * alternate. No purchase requisitions created for DEF123 starting on 1/3. Expected/Wanted Result:Everything we saw happen for the FG and the ABC123 item act
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.