Hi Jari,The settings for copying the functional structure from IFS/Project Deliverables to either IFS/Asset Design or IFS/Maintenance depend on the role of the organization in the project.Typically, a prime contractor is responsible for designing the project product and creating the equipment structure for maintenance.In the Engineer-to-Order scenario, CAD data extraction for Production Deliverables registers Equipment Tags, parts, and pre-assembly definitions in IFS/Design to perform work preparation, procurement, and prefabrications.The construction and installation of the systems are planned in parallel stream with IFS/Project Deliverables.Project Deliverables structure for system installations is based on the commissioning strategy and is different from the functional structure that was used during the design phase. The approved functional structure is used for Mechanical Completion (MC), Commissioning, Handover, and Equipment Maintenance.If the Object Property COPY_TO_MAINTENANCE
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.