In Cloud version 22R2, we have control plans using Acceptance sampling parameters.
For a part, with “skip lot inspection” and a inspection frequency 1 of 2, the system generates an analysis to be completed for the 1st receipt. For the next receipt, an analysis is also automatically created but in the status “confirmed” with the acceptance sampling status “skip lot” . So nothing to do on this analysis. That is all well and good !
However, I do not understand why we cannot receive the part in stock without registering inspection results. In the receipt line, we have a quantity in the field “qty to inspect” and the status is “to be inspected”.
Why the status of the receipt is not “to be received” and the qty to inspect 0 ?
Is it a misunderstanding from my part or I am missing something ?
Because, if I make the parallel with a control plan using a trigger “interval scheduled = 2”, the status of the 2nd receipt is automatically set to “to be received” and the qty to inspect is 0. So the parts can be directly received in stock as no analysis has been created and it is not required to register the inspection results.
Hope someone can enlighten me on this subject :-)