One of our Dispatchers ran some 15 PMs from PM Batch Scheduler (not Scheduled, but on the fly). This job failed, and we see on the contracts that no PMs are generated.
AFAIK there is a lock on these contract lines somewhere, to avoid multiple PMs being generated at the same time. But where is it? We would like to re-run these ASAP