Hi,
When an IMO has material status >= Ship list Open OR >= Pick list Open OR = Pack list Open the ‘add’ button on IMO is disabled, so you cannot add extra lines and create an second ship, pick of pack list for the new added product.
Is it possible by default to add new lines after ship,pick of pack list is open.
In v10 it seems it was possible to do this.
Can this be a change request if its not possible?
Or can this process explaned why this is designed compared with v10.
We are on Version 15.3.4(5)
Thanks.
Robin