Solved

IFS Maintenance Work Order or Serial Object linking to Work Centre

  • 7 December 2020
  • 3 replies
  • 180 views

Userlevel 1
Badge +6

I have recently been asked to report on historical Work Orders resulting in Work Centre down time. I am vaguely aware that Work Orders or Serial Objects can be linked to Work Centres but would like some guidance if someone is willing.

I need to understand if, how and what should be considered if either objects or work orders are linked to a shop floor work centre.

Whilst we use the shop floor work bench we do not use any of the scheduling or capacity planning tools for Shop Orders.

Many thanks,

Matt

icon

Best answer by Mayura Wasantha 8 December 2020, 05:47

View original

This topic has been closed for comments

3 replies

Userlevel 6
Badge +15

You could link an equipment object to the work center as a Resource ID in the Resource Tab.

 

 

Userlevel 1
Badge +6

Thanks Mayura, that seems to have worked for me in our Test environment. Lots of work to do as I would imagine there any many component objects per work center.

Are there any other considerations to be aware of, does this directly impact or influence anything else such as financials or anything else on the factory floor or engineering wise?

Kindest regards,

Matt

Userlevel 6
Badge +15

No, no such impacts of influences in other areas.