In Aurena, My Time Registration – Grid view, is it possible to select all the lines under “Job Hours” to do changes rather than do changes line by line.
In reviewing the Rules for Shop Order Backflush help doc, it shows the order of priority in the various methods, however one of the lines states: if the part’s manufacturing attributes allow backflush from All Locations, then all Picking locations are searched. The question is, in what order are picking locations searched? When I have multiple locations which have a part to be backflushed in the needed quantity how can I predict the location from which inventory will be consumed? The same question exists for floor stock.
When a project date of end is extended, the demand's required date is also updating on its own. As per the definition of “Required Date” this is updated automatically. Is there a way to modify this set up to not be updated as such?
Is there any configuration to choose different Alternative of Routing / Product Structure while using MRP / PMRP?
I’ve created a new shop order by following a training doc support. I’ve got the following error message : “Structure Revision is null. Issuing is not allowed”. And during the flow, the following question (Popup) appears : “The shop order is for revision of part XXX-YYY. The location you selected in row 1 have different revison for the part. Do you want to continue?” I’ve answerd yes after checking that they are both rev 1. All advices are welcome. Thank you.
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.