Hi @Niyonwe had configured the SSL cert as it was already there before the upgrade. @Charith Epitawatta thanks for input let me check the same also.
Hi , This env is APPS10 UPD19. it is recently upgraded from UPD7 to UPD19.and while logging to the Application login page is coming. its very helpful if anyone can suggest.
i have crosschecked we are using TLS 1.2 only.
Hi @Charith Epitawatta,On the same server, Production Print agent i’m trying to configure but prior to prod i have configured its pre-prod env and it is running fine with 8100 rest port. if i stop the preprod one and trying it to start from the prod one by changing the connection string to preprod its working but when i revert it to prod connection string its throws the error. Preprod REST PORT - 8200 and PROD REST PORT - 8100.
I checked the memory space on Sever, above the SC,@Sajith D As you suggest to properly shutdown the managed-servers, i have gone through only step 1. prepare database and in step 2. deploy database getting this error. so not able to Create IFS_HOme step.
HI Deepti, Physically also i have to put the RDL file in path before importing as i checked its not there. E:\IFS_HOME\IFSPROD\repository\server\reports\layouts
Already have an account? Login
No account yet? Create an account
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.