I have extended the calendar for another 10 years, however I don’t recall how to update the current maintenance plan in the existing PM Actions. Do I need to generate a new calendar or can I use the existing one?
How far out can you set this calendar, 5, 10 or as much as 20 years?
Thank you for your assistance.
Best answer by Kasun Manuranga
View original