We recently upgraded from Apps 10 UPD4 to Apps 10 UPD7 and it seems like there was a change in behavior in the Create Project Wizard. The “Copy Existing Project” box is now checked by default and we haven’t been able to figure out where to turn it off. Does anyone know if this can be unchecked by default? And if so, where?
Thank you,
Joann
RMB in the left side of the navigator window or the bottom area of the window. Select Create New Project
At the bottom of the the window 1/7 the Copy Existing Project box is checked by default
Best answer by anmise