This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Most views
Could someone explain to me the difference in the values found in the various Part Cost Bucket tables? part_cost_bucket_tab part_cost_bucket_one_tab part_cost_bucket_history_tabI am attempting to construct a Bill of Materials for a data warehouse, and these three tables seem to carry slightly different values. For the purposes of demand calculations in the data warehouse, I need to be able to leverage a Bill of Materials as of any point in time, so I was hopeful that the history table would include everything I need -- but there are some examples of Part associations in the other two tables not available there.I could perform a simple union of these tables in my SQL query in order to handle for any missing data -- but that feels like a weak solution that could generate more confusion than it alleviates.Any guidance others could provide me on the nuances between these tables would be greatly appreciated. Thanks!
Hi,Does anyone know if there is a difference between a shop order with a manufacturing status and a shop order with a prototype status? Thanks
To support the Oil & Gas industry in a better way you now have the possibility to apply IFS Oil & Gas Extension based on IFS Applications 10 Update 5. It contains of the following Sales Parts:Oil & Gas Extension - Replication Oil & Gas Extension - Site Move Oil & Gas Extension - DNV Authorization Oil & Gas Extension - Transport Order
Hi, our customer has a requirement to generate a rework order(shop order) in IFSinside the rework order, (1)It should indicate which component need to be dis-assembly(2)And record the actual dis-assemblied Serial No and re-assebmly Serial No(3)And record the time and cost. In IFS, is there any function can meet this requirement?
We have picking days set as 3 days but all Shop Orders seem to finishing just in time for the demand. We want stock to be on our shelves 3 days before it needs picked for the demand shop order or customer order. Anyone else having this issue ??? Or have we a setup incorrect ??
Hi were are currently in the process of upgrading to apps 10 and ran into an issue.All of our inventory parts are set to Part Type “Purchased” - as we sometimes will buy and other times build the same part. We also have both Purchased & Manufactured product Structures for each of these parts. When quoting customers we use a business opportunity that we link to an Estimate (if we are manufacturing the part). In doing so, the estimated end item will use the default part type as being purchased (rather than manufactured) and will not allow the user to update it to Manufactured Part Type. So when the user builds the product structure - they are building the purchased part structure instead of the manufactured product structure. IFS recommended we simply update the Part Type to be Manufactured on the inventory part record. This resolves the issue on the estimate but creates another problem for procurement since the part is now manufactured and it is no longer considered for stock reple
Hi,Is anybody using conditional codes for serial tracked items? I am wondering why if I change condition code from the one that does not have Availability Control ID to one that has it – system assigns that Availability control, but if I do it opposite way – from the one that has AC ID to the one that does not have it, system does not remove the AC ID? See below screens:Best regards,Bernadeta
Good Day, Is there any expert here that can give me documentation on IFS Costing?99% of our clients use Manufacturing and it will really help me to get an understanding of how costing in IFS works.
If a repair shop order is created from component repair order is there any way in IFS to attach the shop order material to project inventory supply type? After that we want PMRP job to create demand for those materials. IFS does not seem to have anyway to convert consumed materials to Project Inventory.
We are trying to close out a project but we get the message that there is some work that remains to be completed. When we go to the Unfinished Activity Work window the message reads,‘There is at least one Project Transaction which has not been completely invoiced or where Multi-Company Reporting Revenue voucher has not been created.’How do we resolve this issue? The project has transactions from back in like 2006, 2007, 2008 so invoicing is not an option. We just want to close this project.
Hi.I have a customer that have differences between the estimated and actual cost. In fact, the shop order actual cost is retrieving work center cost and labour class cost when these data in IFS are zero (I checked all the work centers and labour class). The inventory parts are valued at “Cost Standard” but never the cost set 1 was copied on any of them.Has anyone ever had this problem?Actual cost:Inventory part: Routing: Some Work centers Labor and Operation History
How is it possible to revalue the weighted Average costed part?Imagine a scenario where the inventory part is set up at Weighted average and made several receipts. The part has been in inventory for several years without any recent transactions. Now the business understands the value of the stock has gone down. Is there a way to revalue the inventory so that the previous value will change and the lost value charged against PnL. This is possible under standard cost.. but the concern is how to do this under Weighted average method.
Could the esteemed mates provide with documentation on ‘ Everything-to-Know’ about Touch Apps.
Pre requisite: Set “Qty Calc Rounding” for part as “0”.Assume the Number = 150.00000000000012 When an inventory part has the UoM as Weight (kg), Volume (l), or Length (m), the rounding of the “Qty Required” for Shop Orders work as follows;ROUND(150.00000000000012, 0+ 2) = 150 However, when the UoM is set as “EA” (Each), with a Base unit “pcs”, the function behaves as follows;TRUNC(150.00000000000012, 0) + POWER(10, 0 * -1) = 151 If the “Qty Calc Rounding” for part is “2”. The value for UoM EA is 151.01. It seems when the UoM is EA the quantity is always rounded up regardless of the number.
How do I find PO if I only have the Batch Number?
Hi, I'm looking for a documentation of Document Management Office Add-In for IFS10. Who can help me, please?
Hi. Using apps 10 and wanted to know if there is a search i can run that will show me all the parts within a structure and there standard lot size (like multilevel availability planning) ? regards Jamie
I have created a saved search within Search In Context within the Manual Issue Shop Order screen Details tab. Which produces: But cannot find anywhere where I can set this Saved Search to be default. Please advise.
We are using Apps 10.We are currently reporting floor operations manually. We have highly skewed numbers that are tied to WIP. We continually have a negative balance in our labor expense account. The posting control is set to debit WIP and credit direct labor. Direct labor only is debited when we post payroll, but still remains at a credit balance in the millions. What is the transaction to move WIP and all associated costs to finished goods? It doesn’t appear to be happening.
22R2Looking to use handheld barcode scanners in the manufacturing processes for various transactions. 1. What type of handheld scanners are supported by IFS Cloud 22R2?2. It appears that Scandit license is needed. Does IFS provide that license or does it have to be purchased separately? 3. Is there any documentation on how to set up the scanner to connect to IFS.4. Is there any documentation on the configuration/setup in IFS to use the scanner/barcode.
Interested on Kanban functionality. Could you please share any document on setting up the basic data and information on how to use the fuctionality?
Hello Community, How can phantom part be easily recognized in the system?Do we have to check the Inventory Part Planning Data - Planning Method or is there another way?Thank you,A.
Morning We are using IFS apps 10 and I have been reviewing work centre capacities and have noticed large discrepancies in average capacity and demonstrated capacity but cant understand why?the work centre below is for a welding work centre with an average capacity of 7.15 hr but a demonstrated capacity of 39.6 hr. Available and theoretical capacity are both showing 7.75 hr per day.When reviewing the resource detail the capacity calculation base is set at group with a resource quantity of 5 to reflect the 5 welders working within this work centre (all with the same labour class) and group utilisation at 90% . does any one know the cause of the discrepancy? kind regards Jamie
We are looking to simplify the login process for our manufacturing shop floor computers. Our plan is to have the clients launch from this link to bypass the IFS Landing page https://ifsserver:49080/client/runtime/Ifs.Fnd.Explorer.application My question is, can you pass login credentials to the IFS IEE client so it auto logs on? The only use for these workstations, will be Shop Floor Workbench.
Could someone explain to me in detail the purpose of the W/D/R option?How to use it correctly and what impacts does it cause when used?