This will include the questions related to Manufacturing, Projects, Engineering, and Warehousing (WaDaCo).
Newest first
A. Brief descriptionSome manufacturing processes require additional finished units to be produced for destructive or non-destructive testing. These units are manufactured together with the quantity required by the original demand, but they are not part of that demand and may be destroyed, damaged, or released as usable products depending on the test result.IFS Cloud does not currently provide a clear and traceable way to distinguish the quantity required by the original demand from the additional finished quantity required for testing. This can lead to manual adjustments, incorrect MRP quantities, unclear supply availability, and limited traceability between production planning and quality assessment.B. Context and scope1) Who is affected?Customers Partners2) FrequencyFrequentlyC. Value and impact1) What is the business outcome?Improves productivity or efficiency Reduces cost or manual effort Enables new capability Supports compliance or reduces risk 2) WorkaroundThe current workaround
Hi,When modifying an Outside Operation in Routing, entering a new non-existing Outside Operation Item (OOI) no longer triggers the "Create Outside Operation Item" dialog. Instead, it throws an error.Work around solution as below:Temporarily change the Work Center from the Outside Operation Work Center to a different Work Center. Close the "Create Outside Operation Item", because the wrong center is selected. Change the Work Center back to the original Outside Operation Work Center. The "Create Outside Operation Item" dialog is then triggered. Continue editing and save the routing. However, this option was available in APPS10.Outside Op Item is modified and tried to save. Is there any straightforward method in cloud as well?A window will be popped up requesting to create a new Part Number.Once proceeded with selecting Yes, it will direct to another window where the user is able to create a new Part.After required data is given, the Outside Op Item will be available in the routing operat
We would like to confirm whether the following requirement can be implemented using only the Excel Add-in, without any custom add-ons or extensions.We have already implemented the process from Material Request creation to Product Issue registration using the Excel Add-in.We would like to create and manage orders using the Note field as a key attribute.Orders should be consolidated when they have the same Note value. If an order with the same Note already exists, we would like to add new line items to the existing order only when specific conditions are met.Is there any way to implement the above requirement using only the Excel Add-in?Our current implementation approach is documented in the attached Excel file. Could you please review it and let us know whether there are any configuration options or changes that would enable this functionality?
We are receiving the following error when attempting to test print a Custom Label from the Shop Order Workbench in DEV: The report definition has been configured, and the layout has been successfully imported. What is the recommended approach to resolve this issue?
Hello,We have the following setup in Production: Galvanization is subcontracted, so we have configured a dedicated outside operation work center for galvanization and assigned it to the routing. Transportation to the subcontractor is also outsourced. We want to capture transportation costs against the manufactured parts, so we created a separate outside operation work center for transportation and added it to the routing as well. When a shop order is released, purchase requisitions are automatically generated for the transportation operation. Since multiple shop orders may be shipped together, we can consolidate several transportation requisitions into a single purchase order and use one transport service for all parts being sent to the subcontractor.The problem: Our transportation provider issues one invoice for a single transport service, regardless of the number of parts being transported.However, the purchase order generated from the routing contains transportation service lines
We are on IFS cloud 25R2 and have turned the parameter “Create Part Revision for each Eng Revision” to “NO” on Part Transfer Template screen.Why the system never wants to update the first part revision even if it is with a tentative structure and not in effect part revision 1 ?For a purchased part (with empty structures), the fact that a second part revision is systematically created when transfering eng part rev is a problem.Actually, with 2 differents part revisions for a purchased part, you have to make a distinct counting on each rev when inventorying.If we have decided to manage a technical modification of a purchased part by usage of a new revision instead of a new part number, this is really because we don’t want to make a different stock management on this part..Thank you for the explanation about the specific behaviour of 1st revision
Hi, We are looking for a way to create a simple forecast and based on that plan the supplies. The version is IFS Cloud 25R2.The actual demands (COs) of the finished goods for next 3 months can be taken as firm, however the demands beyond that are unconfirmed so forecasts can be setup. There are components with long lead times so better start planning for those in advance, based on a forecast. It is understood that Master Scheduling functionalities would come handy in this. The main concern is, moving the business to plan using Master Scheduling is a considerable change of practice, and might not be feasible with the go-live plans at the moment. Do we have a way to simply enter a forecast in IFS Cloud (not using MS) and plan the rest using MRP ?
Hi everyone,We are experiencing an issue with the Create Standard Part from Configuration functionality for a Multi-Level CTO structure and would like to know if others have encountered the same behavior and how that was solved. When creating a Standard Part from a completed/excisting configuration, the system appears to include all configured components in the structure, rather than only the components that belong to the evaluated configuration.We observe the following behavior:If "Use Configuration Description as Part Description" is selected, only some components receive a value in New Part Description. When proceeding to the next step, the process fails with the error: If "Use Configuration Description as Part Description" is not selected, the system appears to generate descriptions for all configured components, including components that should not belong to the selected configuration.Because of this, it looks as if components excluded by the configuration rules are still being in
以下の要件は、カスタムアドオンや拡張なしでExcelアドインだけで実装できるのかお聞きしたいです。Excelアドインを使って、資材要求から商品発給までの登録を実装しました。注釈フィールドをキー属性として注文を作成・管理したいと考えています。注文は同じ注釈値で統合されるべきです。同じ注釈の注文がすでに存在する場合、特定の条件が満たされた場合にのみ既存の注文に新しい行項目を追加したいと考えています。上記の要件をExcelアドインだけで実装する方法はありますか?現在の実装方針は添付のExcelファイルに記録しています。この機能を実現するために変更や設定できる部分があれば教えていただけませんか?
I would like to ask whether there is a way to control material issues for Material Requisitions and Shop Orders separately.Currently, we would like to achieve the following:・Allow material issues based on Material Requisitions from a specific storage location.・Prevent material issues based on Shop Orders from the same storage location.We have reviewed the Part Availability Controls functionality; however, it appears that this setting controls both Material Requisition issues and Shop Order issues in the same manner.Is there any alternative method, configuration, or functionality that would allow these two processes to be controlled independently?
All, I have had a couple of questions sent me regarding visual scheduling of shop orders. One of our customer's business units wants to be able to use visual capacity requirements planning to do their longer term assignments to operators on the shop floor. They then use drag and drop scheduling to move work from a general work center to a specific work center for an operator. When they highlight a shop order to move, the display does not provide any information or the status of the materials required for the shop order. Has anyone done a modification to the dialog box that shows the shop order information to allow it to show the material status?
WHen we go to add records to a spare parts forecast, do I need to turn on the online consumption flag on the inventory part?
We create our supply orders through Project Demands and have a manufactured part, including several sub-assemblies, that is used across different activities within the same project.Inventory Part data for one of the sub-assemblies is configured as follows:Variable Lead Time (Days): 36 Fixed Lead Time (Hours): 0 Manufacturing Lead Time: 36 Expected Lead Time: 5We have a customer order line with a Wanted Delivery Date of 26/03/2027, and PMRP/MRP is executed overnight.Recently, the resulting Shop Order Requisition was created with what appears to be no manufacturing lead time being considered:Shop Order RequisitionProposed Start Date: 16/03/2027 Due Date: 17/03/2027Based on the lead time settings above, we would have expected the planning process to schedule the start date earlier and take the 36-day manufacturing lead time into account.What makes this particularly unusual is that we processed a similar demand for another activity within the same project, which was released earlier, and t
I need an inventory part for water that will be used in bills of materials and production orders.I would like its consumption/issue to be recorded in the production order. Is it possible to do this without receiving it into inventory first?I created an inventory part called “zero cost forbidden”, but in order to issue it from a production order, I first have to post a receipt into inventory (as an alternative solution, this works).I tried using “Negative On Hand Allowed”, unfortunately without success. In this case, it seems that there must also be at least one received quantity in inventory before an issue can be posted.I also tried “Allow as Not Consumed”, but then it is not possible to issue the item from inventory.Is there any other way to record the issue/consumption of water for production while having an inventory part with zero cost and no inventory quantity?Thank you in advance for your answers.
Dear Team,I am new to IFS cloud deplyong the solution on-premises. Kindly recommend third-party tools that I can deploy to help me with managing user licenses and that can also be used on other platforms. Also if there are tools i can use for helping in administration and they are not part of the default delivery.
Hi everyone,I have a question regarding inter-site transactions between sites belonging to different IFS databases.The IFS documentation states that Distribution Orders cannot be used to move parts directly between different databases. However, it also mentions that Inter-site Purchase Orders and Inter-site Customer Orders can be used between different databases, with Message Handling configured to send the inter-site PO to the supply site.My question is specifically about the technical connectivity between the two IFS databases.For example:Database A → Company A → Site A (Demand Site) Database B → Company B → Site B (Supply Site)If an Inter-site PO is created in Database A and needs to create the corresponding Inter-site CO in Database B:How is the connection between Database A and Database B established in IFS Cloud?
It is frequent for us to issue a qty of materials on a shop order that is over or under the qty planned on the product structure, since the final amount of material used is not known until the completion of an operation midway through the order. If the amount issued is under the Required Qty, then the Remaining Qty to Issue on the material line still appears as Demand Quantity on MRP Part Information, until the rest of the shop order is closed - this throws off MRP calculations as the system still thinks that amount will be consumed on that shop order, even though the final qty has already been issued for that material line. The only known way for us to remediate this is to manually change the Required Qty of the material line to match the actual issued qty. Has anyone else dealt with this issue before, have an automated solution or just something we are missing? We are targeting only material lines with Manual reserve method.
Hi all,We have a situation where MRP plans manufactured parent and component parts sequentially, while in reality production can start before the supplying shop order is fully completed.Example:Part A is a manufactured component. Part B is a manufactured parent part that uses 1 piece of Part A. The routing for both Part A and Part B results in approximately 1 hour lead time per piece. For a shop order quantity of 40 pieces, the total lead time becomes approximately 1 week.As a result, MRP plans:Shop Order for Part A from Monday to Friday. Shop Order for Part B starting the following Monday.This means MRP assumes all 40 pieces of Part A must be completed before Part B can start.In reality, once the first pieces of Part A are completed, production of Part B could already begin. Therefore, we would like MRP to generate requisitions and planned shop orders with some degree of overlap.Additional information:The product structures and routings have been migrated from our previous ERP system
Hi All,Technical documentation for 26R1 - discribes a feature to show Autocad drawings in IFS pages.Has anyone tried it ? kindly share experiencehttps://docs.ifs.com/techdocs/26r1/060_development/022_user_interface/030_aurena_dev/130_aurena_component_reference/120_client_controls/xd_viewer/ “The XD Viewer is a reusable Angular component designed to integrate Autodesk Forge Viewer for seamless 3D model visualization within the application. This component is part of the EXPFW client control set, making it easily embeddable within IFS cloud pages using the marble syntax.”Thanks and regardsSaman
Hi, We are looking for IFS Cloud standard solutions for the below requirements. Appreciate your inputs.IFS Cloud 25R2 MRB Quantity update Once we create a MRB the system is not allowing to modify the Qty to Disposition, even the MRB is still in Planned state. We receive PO through multiple receipts but to a same Lot/Batch No. it is required to update the already opened MRB with new quantities. This is not possible at the moment When creating a MRB for Shop Order or PO Receipt is it possible to temporarily transfer these quantities to a different location (something like a quarantine location)? so once the MRB process is done the Qtys can be scrapped or re-transfer to the original location. (We are aware about the Available Control ID setup but that is usable only when creating MRBs from Inventories in stocks) Any possibility to apply the “Scrap Verification” feature in MRBs created for PO Receipts and Inventories (IPIS) ? So the scrapping is enforced in the Receipt or IPIS. Or may
Hi!We’re trying to set up an object connection transformation to inventory part to the Shop Order Multilevel Repair Structure page. Our best guess would be to set upDocument Object Connection on LU ShopOrdUtil, view AS_BUILT_CONFIG_HEAD_SO or AS_BUILT_CONFIGURATION_SO. Object Connection Transfer with InventoryPart as source and ShopOrdUtil as target.It is possible to set up, but the page shows no attachments at all. In fact, there is no paperclip symbol at all and no attachment panes, other than for the shop order at the very top. The rest of the page is connected to a tree. We’re guessing there is some limitation that makes the object connection transformation impossible to use here, or does someone know of a workaround?And, if you know it’s not possible, exactly why?
Hello,We have a requirement where the Part Cost for a fabricated part should automatically match the value entered in the Part Unit Cost field.Is there a standard IFS Cloud functionality or setup that allows the Part Cost to be synchronized with the Part Unit Cost automatically?Any guidance or experience on this topic would be appreciated.Thank you.
We are producing Product A (Produced Part) using Product B (Component) at a 1 to 1 ratio.We over-produced Product A by qty 10.We want to “disassemble” product A. What is the best process to follow so:Product A (Produced Part) inventory reduces by 10 Product B (Component Part) inventory increases by 10We have used just the Unreceive functionality but it causes financial issues with the component part.
Hi everyone,Hi everyone,I have a question about a configurable item. Where can I find information on how the cost of individual operations was determined for this item?For non-configurable items, there is the Part Routing Cost screenThanks in advance for your help
We have the issue, that we use “Reserve an Bacflash” as settings for the issuing material from floor stock.Now we have connected the correct Locations to the Work Center and we produce normal.Operator has reserved 1 of the 2 reels, which are available on his floor stock. Now he has not so much qty on this reel to report the produced qty, but he has entered the fully produced qty. and the system has taken the difference from the unreserved material from his location. How we can fix this in the best way, that the system stopps and give a warning, you have not enough material reserved for this issuing.
Already have an account? Login
No account yet? Create an account
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.