Hello everyone,
I have a question.
It is the first time I am trying to set up a wadacco process - generally, I would like to set up a process in a way that it coppies the process in IFS Cloud:
- Inventory part in stock reservations
- Type - shop order material
- Mark the given shop order
- Pack the items on a handling unit
- Move the handling unit with Transport task into the shopfloor warehouse
- Start the transport task
I have tried to use the default processes like:
- Manual Issue Shop Order Part
- Attach Part to Handling Unit
- Process HU on Transport Task
But they do not follow .. and the material is issued already after the first step without the packaging or the transport task themselves - so I guess I am missing something.
Lot / Batch numbers would be optional, not mandatory. Handling units to be picked out of the list of handling units (not default). Transport task would be started and also finished in the same step once loaded on the highlift.
Does anyone has this set up already and is willing to share?
Thank you,
Best Regards
PetaKu